The Short Answer
Pangea is a two-tower project by Times Group Corporation at 3825 Highway 7 East in Unionville, designed by CORE Architects. The south tower is 45 storeys, the north tower is 40, joined by a four-level podium, with 811 units in total. Marketing calls it the fifth and final phase of Uptown Markham. It is the fifth phase. It is very likely not the final one: Times Group has Uptown Markham Phase 6, in two blocks at 38 and 30 storeys, and a Phase 7 listed as coming, at the same address. Published prices have run roughly $629,000 to $1,225,800, around $1,133 per square foot, with occupancy marketed for spring or summer 2028.
Want this applied to your own property? Call the Kaizen Real Estate Team at (647) 370-8885.
The "Final Phase" Claim
Start here, because it is the part of the marketing that a buyer should test.
Pangea is widely described as "the fifth and final phase" of Uptown Markham. The fifth part is accurate. The final part is marketing language rather than a documented fact, because Times Group and CORE Architects have further phases in the pipeline at the same 3825 Highway 7 East address:
- Uptown Markham Phase 6, Block 1: 38 storeys, approximately 123.87 metres, 760 units, pre-construction
- Uptown Markham Phase 6, Block 2A: 30 storeys, approximately 99.84 metres
- Uptown Markham Phase 7: listed as coming
This matters practically rather than philosophically. A buyer choosing Pangea partly because the community will be finished, and the construction over, should know that more towers are planned on the same lands. Michael John Lau, a REALTORĀ® with the Kaizen Real Estate Team, one of the most active real estate teams in Markham and York Region, raises this because "final phase" is a scarcity argument, and a scarcity argument should be verified before it moves a purchase decision.
Questions About Your Situation?
Every Markham property and every timeline is different. Call the Kaizen Real Estate Team at (647) 370-8885 and speak to a REALTORĀ® who works this market daily.
What Pangea Actually Is
Item | Detail |
|---|---|
Developer | Times Group Corporation |
Architect | CORE Architects |
Address | 3825 Highway 7 East, Markham (Unionville) |
Towers | Two, joined by a four-level podium |
South tower | 45 storeys, approximately 139.6 metres |
North tower | 40 storeys, approximately 124.85 metres |
Units | 811 total: 378 south tower, 336 north tower, 97 podium |
Site plan file | SPC 22 246371 |
Zoning | Markham Centre By-law 2004-196 |
Minor variances | Three recommended for approval at Committee of Adjustment, 30 August 2023 |
A note on the unit count. Published sources give 811, 809 and other figures, and some list Pangea as a single tower rather than two. The City of Markham's own Committee of Adjustment staff report is the authoritative document, and it describes two towers and 811 units.
Uptown Markham, the Larger Community
Uptown Markham is a Times Group master-planned community of roughly 88 acres at Warden Avenue and Highway 7 in Unionville, including approximately 50 acres of greenspace along the Rouge River valley.
The phases, as marketed:
- River Park
- Riverwalk
- Riverside
- Riverview
- Pangea
Completions on record include Riverside at 28 storeys in 2018, and Riverview II at 36 storeys and Riverview III at 42 storeys, both in 2023. Riverview III is currently among the tallest completed buildings in Markham.
No published source gives a total build-out unit count for Uptown Markham, which is itself informative about how much of the community is still ahead rather than behind.
Neeraj Moolchandani on Testing a Scarcity Argument
Neeraj Moolchandani, REALTORĀ® at Kaizen Real Estate, treats the phrase final phase as a claim rather than a fact. Times Group has Phase 6 in two blocks and a Phase 7 listed as coming, at the same address.
Scarcity moves purchase decisions, which is exactly why Neeraj asks buyers to verify it. A buyer choosing this building partly because the construction will be over should know that more towers are planned on the same lands.
Pricing and Timeline
Published figures have shown suites from roughly $629,000 to $1,225,800, at approximately $1,133 to $1,135 per square foot, with suite sizes from about 530 to 1,099 square feet. Parking has been quoted at $60,000 to $70,000 and a locker at $7,500.
Marketed occupancy is spring or summer 2028. One reference source lists 2027 instead, and sources also disagree on whether the towers are currently under construction or still pre-construction.
That is worth stating honestly rather than smoothing over. Anyone considering a purchase should confirm current availability, current pricing and current construction status directly with the builder, because published aggregator data on pre-construction projects goes stale quickly and at least one listing service has shown a status inconsistent with the others.
Considering a Pre-Construction Purchase?
Marketing dates and contractual dates are different things. The Kaizen Real Estate Team reads the agreement before the rescission period closes.
Location and Transit
Pangea sits on Highway 7 at Warden Avenue in Unionville, on the Viva rapidway corridor along Highway 7. Published walk and transit scores put walkability high and transit moderate.
Unionville GO station is at Enterprise Boulevard and Kennedy Road, in Markham Centre rather than at this site. No sourced walking figure exists for the distance from Pangea to the station, so it should not be assumed to be walkable.
What Michael Tells Buyers Considering It
- Ask for the current price list and availability in writing. Published aggregator pricing is a starting point, not an offer.
- Confirm the occupancy date and the outside date in the agreement itself. Marketing dates and contractual dates are different things, and the contractual one is what Tarion measures delay against.
- Understand interim occupancy before signing. On a 2028 project, there will very likely be a period of paying occupancy fees while not yet owning the unit, and those fees build no equity.
- Price the parking and locker separately. At $60,000 to $70,000, parking is a material part of the decision, not an accessory.
- Treat "final phase" as a claim to verify, not a fact. Phases 6 and 7 are in the pipeline at the same address.