MJL
Michael John Lau
REALTORĀ® Ā· Kaizen Real Estate Team
NM
Neeraj Moolchandani
REALTORĀ® Ā· Kaizen Real Estate Team
eXp ICON 2024 & 202575+ 5ā˜… ReviewsCall (647) 370-8885

The Short Answer

The City of Markham runs building permits through ePLAN, a fully electronic portal, with a $100 non refundable pre application fee. A permit is required for additions, interior alterations, finished basements, removing walls, secondary suites and decks attached to the house or more than 600 millimetres above grade. A permit is not required for like for like window and door replacement, roofing, HVAC replacement, kitchen and bathroom cabinetry, painting or fences. Review takes 10 business days for houses and 15 for accessory apartments when the application is complete, and double that when it is not. General residential alterations are priced at $8.43 per square metre.

Want this applied to your own property? Call the Kaizen Real Estate Team at (647) 370-8885.

10
Business days, house permit review
$8.43
Per square metre, alterations
$100
Non-refundable pre-application fee
4
Markham heritage districts

When You Need a Permit

Markham publishes a clear list. A building permit is required for:

  • New detached, semi detached or townhouse construction
  • Additions to an existing building
  • Interior alterations
  • Finished basements
  • Removal of walls, which covers load bearing wall removal
  • Secondary suites, basement or above garage
  • Coach houses and garden homes
  • Conversions to three dwelling units
  • Detached garages and sheds above the exemption threshold
  • Replacing an exterior wall or cladding

Separate specialized permits cover stand alone plumbing work, signs, pool enclosures, demolition and change of use.

Questions About Your Situation?

Every Markham property and every timeline is different. Call the Kaizen Real Estate Team at (647) 370-8885 and speak to a REALTORĀ® who works this market daily.

When You Do Not

This list saves homeowners real money and time:

  • Decks under 600 millimetres above grade and not attached to the house
  • Interior basement damp proofing
  • Plumbing fixture or water heater replacement, like for like
  • Furnace or HVAC system replacement
  • Electrical work, which falls under the Electrical Safety Authority rather than the City
  • Kitchen or bathroom cabinetry
  • Painting and decorating
  • Maintenance and repairs
  • Window or door replacement where the rough opening is not changed
  • Roofing and shingle replacement
  • Fences, except pool enclosure fencing
  • Retaining walls under one metre
  • Ground or roof mounted solar panels

One contradiction to know about

Markham publishes two different thresholds for detached accessory buildings. The Building Permit Process page exempts structures under 15 square metres, matching the Ontario Building Code. The by law page on decks and sheds says under 10 square metres. The fee schedule lists a tier for accessory buildings under 20 square metres.

If your shed sits between 10 and 15 square metres, call before you build. Markham's Permit Application Administrator's Desk is 905-475-4870, and the City's own advice is: when in doubt, check it out.

The Process, Step by Step

Markham moved to a fully electronic system. There is no paper application counter for ePLAN submissions.

  1. Create an ePLAN account at markham.ca/eplanlogin
  2. Request a new application. A $100 non refundable pre application fee applies
  3. Upload drawings meeting Markham's published Submission Standards
  4. Pre-Screen review checks the application for completeness and compliance
  5. Plans review is conducted electronically, with email notification on completion
  6. Resubmit revisions through ePLAN as needed
  7. Approval arrives by email
  8. Download and print the permit card, placard and one plan set to keep on site

An inactive application may be deemed abandoned after six months. If your project stalls, keep the file moving.

New for 2026: Markham is launching Archistar Zoning AI PreCheck inside ePLAN. It is free, currently optional, and limited to new single detached house permits. It returns a pass or fail zoning report citing the specific by law rule, intended to reduce resubmissions.

What You Have to Submit

  • Applicable Law Checklist
  • Site plan with a zoning summary and property survey reference
  • Architectural, structural and mechanical drawings
  • Designer information, including BCIN qualification
  • Energy Efficiency Design Summary
  • Ontario Building Code Data Matrix for non housing projects
  • Applicable permit fees

2026 Permit Fees

Work

Fee

Pre-application review

$100

Minimum residential permit fee

$151

General residential alterations and repairs, including finished basements

$8.43 per square metre

Secondary suite

$22.08 per square metre

Deck, balcony or porch

$151 each

Detached garage or carport

$707 each

Accessory building under 20 square metres

$151 each

Exterior doors

$498 each

Stand alone HVAC

$1.47 per square metre

Plumbing fixture

$22.35 each

Demolition, single or semi detached

$758 each

Certificate of Completion

$210

Effective for applications submitted after December 31, 2025.

What that means in practice

  • A 100 square metre finished basement: 100 by $8.43 is $843, plus the $100 pre application fee, so roughly $943
  • An 80 square metre secondary suite: 80 by $22.08 is $1,766, plus $100, so roughly $1,866, before Fire registration fees
  • A rear deck: $151 flat, plus $100, so roughly $251

Against the cost of the work itself, permit fees are rarely the reason a renovation does not proceed. Time is.

Neeraj Moolchandani on the Permit That Pays for Itself

Neeraj Moolchandani, REALTORĀ® at Kaizen Real Estate, frames the permit question around resale rather than enforcement. Most homeowners who skip a permit are never fined. What happens instead is that the unpermitted work surfaces during a buyer's due diligence, and the price abatement is many times the permit fee.

The heritage trap Neeraj flags catches Unionville and Markham Village owners in particular. Window replacement and exterior painting need no building permit almost anywhere in Markham. Inside a heritage conservation district both require a heritage permit, which is free but is not optional.

Talk to Neeraj & the Kaizen Team

How Long Review Takes

Project class

Complete application

Incomplete application

Houses and small projects

10 business days

20 business days

Accessory apartments

15 business days

20 business days

Small buildings, non housing

15 business days

30 business days

Large buildings

20 business days

40 business days

Complex buildings

30 business days

40 business days

Demolition and sign permits

10 business days

20 business days

These align with the prescribed time periods in the Ontario Building Code. The clock starts at Pre-Screen approval for complete applications, and at estimated fee payment for incomplete ones.

Note the penalty for an incomplete submission: it doubles the review time on a house. Markham names the usual causes as incomplete drawings, zoning non compliance and missing applicable law approvals. Paying a qualified designer to get the package right the first time buys back two weeks.

Inspections

Inspections are booked through Markham's Inspections Portal. For a secondary suite the City lists the sequence as framing, plumbing and mechanical rough in, insulation, fire separations, then occupancy. A typical house project adds a footing and foundation inspection before framing.

Do not cover work before it is inspected. Opening finished walls afterward is the single most expensive mistake in a residential renovation.

Building Without a Permit

Under section 36 of the Building Code Act, 1992, penalties on conviction reach up to $50,000 for an individual on a first offence and $100,000 on a subsequent offence, and up to $500,000 and $1,500,000 respectively for a corporation. Continuing offences can attract daily penalties.

Municipal enforcement tools include an Order to Comply, a Stop Work Order and an Unsafe Building Order.

The consequence Michael John Lau, a REALTORĀ® serving home sellers in Markham, Ontario, sees most often is not a fine. It is a sale. Unpermitted work surfaces during a buyer's due diligence or on the Seller Property Information Statement, and it produces price abatements, insurance complications, lender questions and occasionally a retroactive permit obligation that requires opening up finished work. A $943 basement permit is inexpensive insurance against that conversation.

For an unregistered second suite specifically, Markham warns that failure to register can result in court action, fines and potential tenant lawsuits following property damage.

Zoning, Variances and the Committee of Adjustment

If your project does not comply with the zoning by law, you need a minor variance before the permit can issue.

Start with a Zoning Preliminary Review. It is optional, carries an additional fee, and Building Standards will identify every variance your project needs so you are not surprised later. Contact 905-475-4870 or [email protected].

The Committee of Adjustment is an independent body of six members appointed by Council, hearing minor variance and consent applications twice monthly at 7:00 p.m. A minor variance must satisfy four statutory tests: it must meet the general intent of the zoning by law, meet the general intent of the Official Plan, be desirable for the appropriate development of the land, and be minor in nature.

The process runs about two months from submission to decision. You post a City supplied sign at least 14 days before the hearing, notices go to properties within 120 metres, a verbal decision is given at the hearing and a written decision follows within 10 days. An appeal to the Ontario Land Tribunal costs $400 plus a $286 administration fee, plus HST.

Renovating? Know the Return First.

Some Markham renovations return their cost at resale and some do not. The Kaizen Real Estate Team will tell you which is which before you spend.

Heritage Districts: The Rule That Reverses Everything

Markham has four Heritage Conservation Districts: Unionville, Markham Village, Thornhill and Buttonville.

Inside them, the usual logic inverts. A Heritage Permit is required before any external alteration to a property in a district or an individually designated property.

A Minor Heritage Permit covers wall cladding changes, painting, window and door replacement, fence modifications and driveway alterations. Every one of those needs no building permit anywhere else in Markham. Inside a heritage district they need a heritage permit.

A Major Heritage Permit covers new dwellings in heritage districts and residential additions on designated properties.

The good news: Minor Heritage Permits are free. The important news: a heritage permit is separate from and in addition to a building permit, so an addition in Unionville needs both. Contact [email protected].

Contacts

This article is provided by the Kaizen Real Estate Team at eXp Realty, eXp Luxury (Michael John Lau, REALTORĀ®, and Neeraj Moolchandani, REALTORĀ®) for general information only. It is not legal, tax, mortgage, or investment advice. Michael John Lau is a licensed REALTORĀ® serving buyers and sellers in Markham, Ontario and the Greater Toronto Area. Permit requirements, fees and review timelines are current to September 2026 and are subject to change. This article is general information and is not legal or building code advice. Homeowners are encouraged to confirm current requirements directly with City of Markham Building Standards at 905-475-4858. Kaizen Real Estate Team, eXp Realty, eXp Luxury. Licence #4784577. 9763 Markham Rd, Markham, ON L6E 1A4. Call (647) 370-8885. Not intended to solicit clients currently under contract with another brokerage.

Frequently Asked Questions

Do I need a permit to finish my basement in Markham?

Yes. Finished basements are explicitly listed as requiring a building permit. The fee is $8.43 per square metre, so a 100 square metre basement is roughly $843 plus the $100 pre application fee.

Do I need a permit to replace windows in Markham?

Not if the rough opening is unchanged, in most of Markham. But if your home is in the Unionville, Markham Village, Thornhill or Buttonville heritage conservation districts, window replacement requires a Minor Heritage Permit, which is free.

How long does a building permit take in Markham?

Ten business days for houses and small projects and 15 for accessory apartments, provided the application is complete. An incomplete application doubles the review time to 20 business days.

What happens if I renovate without a permit?

The City can issue an Order to Comply, a Stop Work Order or an Unsafe Building Order, and Building Code Act penalties reach $50,000 for an individual on a first offence. The more common practical consequence is a problem at resale, where unpermitted work leads to price reductions, insurance issues and retroactive permit requirements.

Do I need a permit for a deck in Markham?

Yes if the deck is attached to the house or more than 600 millimetres above grade. The fee is $151. A low, freestanding deck below that height generally does not require one.

What is a Zoning Preliminary Review?

An optional review by Building Standards that identifies every variance your project would need before you apply, so you do not submit an application that cannot be approved. An additional fee applies. Contact 905-475-4870.

Still have a question? Call the Kaizen Real Estate Team at (647) 370-8885.

A Permit Costs Hundreds. Skipping One Costs Thousands.

Book a consultation with the Kaizen Real Estate Team, or call before you start the work.

Michael John Lau, REALTORĀ® & Neeraj Moolchandani, REALTORĀ®
Kaizen Real Estate Team Ā· eXp Realty, eXp Luxury
9763 Markham Rd, Markham, ON L6E 1A4 Ā· (647) 370-8885

We’re Here to Help

Your questions, goals, and dreams matter to us. Connect with Kaizen Real Estate to experience exceptional service, expert advice, and a team that’s dedicated to your success. Let’s start building your future together.

CONTACT US